Clallam County, WA

County Home Page Permit Info Start Page Public Comment on Permits Public Online Forms Help

Parcel Information

For Parcel No:
04-30-22-24-0300
Status:
Active
Site Address(es):
104 HOOKER RD
PUBLIC UTILITY DISTRICT NO. 1
Owner(s):
Acres (GIS) :
*When clicking links to recorded documents, there are several steps:
On the "Log-In" screen, click the "Public Log In" button (first document of each session)
On the "View Document" screen, in the upper left hand corner,
click the "View Attachment...." link
On the "View Image" screen, near the bottom, click the "Download PDF" link
Zoning:
2014-1310333
Parcel Created:
Mapping Doc
Auditor File No.
5.37 Acres
Parcel is in Dungeness Water Rule Area
Parcel is in Carlsborg Sewer Service Area
In Carlsborg UGA
Link(s) to Assessor Records: (Click Property ID for Assessor information)
Assessor Property ID
Assessor Geo ID
Abbreviated Property Description
PARCEL 2 BLA SURV V75 P91 AMENDED REF SURV V84 P28
0000
043022240300
Permit Cases Associated with this Parcel Record (Click the Case Number for more information)
Case Number
Status
Description
Case Type
Address Assignment
Active
Boundary Line
Adjustment
Finaled
Parcel boundary shift eastward: Parcel A from 14.07 to 10.9 acres; Parcel B from 2.41 to
5.54 acres
Building Permit
Finaled
DEMOLITION OF EXISITING STRUCTURES; INCLUDING PUMP ISLAND CANOPY; PUMP
ISLANDS
Building Permit
Finaled
REMOVAL OF THREE 20,000 GALLON U/G GASOLINE STORAGE TANKS
Building Permit
Finaled
PERIMETER FENCE (approximately 2,355 lineal feet)
Building Permit
Finaled
ADMINISTRATION BUILDING - PUD #1
Building Permit
Finaled
FACADE SIGNAGE [212 LINEAL FT & 101 LINEAL FT] FOR PUD ADMIN BUILDING
Building Permit
Finaled
NEW INSTALLATION OF DUCTLESS HEAT PUMP SYSTEM FOR ADMINISTRATION
BUILDING - PUD #1
Building Permit
Approved
NEW CLEAN AGENT SUPPRESSION SYSTEM WITH FIRE ALARM SYSTEM
Critical Areas
Approved
Removal of 7 cottonwood trees and replacing them with 35 one gallon conifers or 105 conifer
seedlings (see attached document).
Critical Areas
Approved for Specific
Activity
fish habitat enhancement project
Environmental Checklist
Issued
over 4,000 sq ft admin building
Septic Permit
Finaled
Tank Placement---Admin Bldg
***Original stamped plan with revisions showing water, power & sleeves required at time of
final***
Septic Operation &
Maintenance (O&M)
Connected To Sewer
O&M for 2 1000gal septic tanks and 1500gal pump tank serving PUD No. 1 admin building,
pumps to sewer as of 3/1/18, tanks not decom
Sewer Permit
Finaled
Zenovic's IAD letter received 4-9-18##2-20-18 per RB: OK to cover gravity connection at
south end of parcel. Zenovic & Associates will oversee the remaining installation and provide
an IAD letter.
Sewer Permit
Finaled
4-13-18 Zenovic's IAD letter received and approved by R. Bradford ## GRAVITY
CONNECTION ONLY; ZENOVIC WILL DO IAD LETTER PER R. BRADFORD. 3-1-18
Documents Associated with this Parcel
(Click Document to Open)
There are no documents associated directly with this parcel.
Documents Associated with Cases on this Parcel
(Click Document to Open)
ADR2014-00152
BLA2014-00003
BPT2009-00138
BPT2014-00271
BPT2015-00779
BPT2016-00390
BPT2023-01030
CRI2016-00023
CRI2016-00034
ECL2014-00001
SEP2014-00147
SWR2017-00029
SWR2017-00091
Warning Tag
Carlsborg UGA (Sewer Area) - Sewer Connections may be required and Shadow Platting will
be required to satisfy the minimum density requirements for development [CC 33.20.70(3)].
(Parcel auto identified from parcel.plan_area field: parcel centroid in Carlsborg UGA)
Warning Tag
Dungeness Water Rule Area (IN) - Auto added from GIS overlay
Tags Associated with this Parcel

What would you like to do next?

Back to Search
Help Top of Page