Name: PUBLIC UTILITY DISTRICT NO. 1
Application Date: 5/30/2014
Site Address: 100 Hooker Rd
Issue Date: 9/30/2014
Status: Finaled
Finaled Date: 11/13/2015
Building Permit: BPT2014-00271
Subtype: Commercial
Description: ADMINISTRATION BUILDING - PUD #1
Parcel(s) related to this case:
(Principle Parcel: Active)
(Related Parcel: Retired)
(Related Parcel: Retired)
(Click the Parcel Number for more information)
Documents related to this case:
Case Process Steps (Review, Decisions, Inspections, etc.)
Case Entered
Done
... ... Date Entered: 5/30/2014
Potable Water Source Reqd (H)
NREQ
Requirement Placed: 5/30/2014... ... Requirement Met: 5/30/2014
NO REQUIREMENT PER EH REVIEW
Mitigation Cert Review (H)
WSYS
Requirement Placed: 5/30/2014... ... Requirement Met: 5/30/2014
PUD
Road Approach Required (H)
DONE
Requirement Placed: 5/30/2014... ... Requirement Met: 5/30/2014
EXISTING
Landscape Plan Required
DONE
Required: 6/9/2014... Submitted: 6/9/2014... Approved: 6/9/2014
Parking Plan Required
DONE
Required: 6/9/2014... ... Approved: 6/9/2014
Plan Check
DONE
Received: 5/30/2014... Start: 6/9/2014... Completed: 8/12/2014
Occ load = 545; 6-17-2014 Plan review letter sent
Setback Check
DONE
Required: 6/9/2014... ... Approved: 8/13/2014
reviewed by planner
Ownership Verified
DONE
Required: 6/9/2014... ... Approved: 8/13/2014
Lighting Plan Required
DONE
Required: 6/9/2014... Submitted: 9/25/2014... Approved: 8/14/2014
Septic Approval Required (H)
DONE
Requirement Placed: 5/30/2014... ... Requirement Met: 9/25/2014
SEP2014-00147 okay for issuance per Janine Reed.
per Mike Hill they will be hooking into sewer when available. Will be utilitizing old costco system. They
have tank placement permit.
Crit Area/Shoreline Rvw (H)
DONE
Required: 5/30/2014... ... Review Path Decided: 9/25/2014
okay for issuance; reviewed and cleared by planner (DKC)
Planning Review Required (H)
DONE
Requirement Placed: 5/30/2014... ... Requirement Met: 9/25/2014
okay for issuance per DKC
Planning Coml Review Reqd (H)
DONE
Requirement Placed: 5/30/2014... Rvw activities made: 6/9/2014... Requirement Met:
9/25/2014
okay for issuance per DKC
SEPA Determination Reqd (H)
DONE
Requirement Placed: 6/9/2014... Review begun: 6/9/2014... Requirement Met:
9/25/2014
Stormwater, buffer
Drainage Approval Required (H)
DONE
Requirement Placed: 5/30/2014... ... Requirement Met: 9/30/2014
Issue permit (F)
Done
... ... Date Approved: 9/30/2014
Miscellaneous Insp. (Notes)
Done
Required: 3/9/2015... ... Done: 3/9/2015
slab reinforcing on 2nd floor metal deck to line 6
Miscellaneous Insp. (Notes)
FAIL
Required: 3/26/2015... Scheduled: 3/26/2015... Done: 3/26/2015
partial 2nd story slab poured without county inspection. Special Inspector on site during pour.
Firewall Inspection
DONE
Required: 4/21/2015... Scheduled: 4/21/2015... Done: 4/23/2015
Insulation (Walls) Inspection
DONE
Required: 7/29/2014... Scheduled: 6/17/2015... Done: 6/26/2015
2" rigid sOUTH WALL OK BF.
Rough-in Plumbing Inspection
DONE
Required: 7/29/2014... Scheduled: 7/8/2015... Done: 7/8/2015
CUSTOMER BATHROOMS OK. BF
EMPLOYEE BATHROOMS DWV OK. BF
Insulation (Walls) Inspection
DONE
Required: 7/16/2015... Scheduled: 7/16/2015... Done: 7/16/2015
1ST FLOOR EXTERIOR WALLS AND VAPOR BARRIER
Underslab Plumbing Inspection
DONE
Required: 1/29/2015... Scheduled: 7/21/2015... Done: 7/21/2015
Insulation (Walls) Inspection
DONE
Required: 7/29/2014... Scheduled: 7/27/2015... Done: 7/27/2015
Miscellaneous Insp. (Notes)
DONE
Required: 9/25/2015... Scheduled: 9/28/2015... Done: 9/25/2015
Ceiling Grid from 6 line west; lower floor JAD
-Drainage Inst as Des Ltr Reqd
DONE
Required: 7/29/2014... ... Done: 10/13/2015
ENGINEER'S INSTALLED AS DESIGNED LETTER RECIEVED AND APPROVED
Landscaping Inspection
DONE
Required: 6/9/2014... Scheduled: 10/15/2015... Done: 10/15/2015
Parking Inspection
DONE
Required: 6/9/2014... Scheduled: 10/15/2015... Done: 10/15/2015
-SEPA Mitigation Finaled
DONE
Required: 9/25/2014... ... Done: 10/15/2015
Miscellaneous Insp. (Notes)
DONE
Required: 7/29/2014... ... Done: 11/12/2015
hydrant flush test
Setbacks Inspection
DONE
Required: 7/29/2014... Scheduled: 3/9/2015... Done: 11/12/2015
Erosion Control Measures Insp
DONE
Required: 7/29/2014... Scheduled: 3/9/2015... Done: 11/12/2015
Footing Inspection
DONE
Required: 7/29/2014... Scheduled: 3/9/2015... Done: 11/12/2015
1/30/2015 Site visit.BF
Foundation Stem Wall Insp
DONE
Required: 7/29/2014... ... Done: 11/12/2015
Mechanical Systems Inspection
DONE
Required: 7/29/2014... ... Done: 11/12/2015
9/25/15 From 6 line west lower floor - JAD
Framing/Airseal/Glazing Insp
DONE
Required: 7/29/2014... ... Done: 11/12/2015
6 line; A line; and 15 Exterior 6/3/15 JAD
Insulation (Floors) Inspection
DONE
Required: 7/29/2014... ... Done: 11/12/2015
Insulation (Walls) Inspection
DONE
Required: 7/16/2015... Scheduled: 10/6/2015... Done: 11/12/2015
2ND FLOOR EXTERIOR WALLS
Insulation (Ceiling) Insp
DONE
Required: 7/29/2014... ... Done: 11/12/2015
Fire Protection Inspection
DONE
Required: 7/29/2014... ... Done: 11/12/2015
Sign Inspection
DONE
Required: 7/29/2014... ... Done: 11/12/2015
Exterior Lighting Inspection
DONE
Required: 9/25/2014... ... Done: 11/12/2015
Address Posted Inspection
DONE
Required: 7/29/2014... ... Done: 11/12/2015
-Fire Sprinkler Permit Reqd
DONE
Required: 7/29/2014... ... Done: 11/12/2015
-Fire Alarm Permit Required
DONE
Required: 7/29/2014... ... Done: 11/12/2015
-Deferred Submittals (list)
DONE
Required: 7/29/2014... ... Done: 11/12/2015
Hydrant flow test report; steel joists(received 1/26/2015); steel stairs; equipment storage; seismic design
of nonstructural complonents; exterior cladding systems
-Structural Observation Reqd
DONE
Required: 7/29/2014... ... Done: 11/12/2015
Architect/Engineer shall submit a final statement that all "Special Inspections" and "Structural
Observations" have been completed to their satisfaction.
-Special Inspection Reqd
DONE
Required: 7/29/2014... ... Done: 11/12/2015
Architect/Engineer shall submit a final statement that all "Special Inspections" and "Structural
Observations" have been completed to their satisfaction.
-Energy Compliance Certificate
DONE
Required: 7/29/2014... ... Done: 11/12/2015
Mechanical & lighting systems commissioning report
Final sign-off
Done
... ... Finaled: 11/13/2015
Final Inspection
DONE
Required: 7/29/2014... Scheduled: 11/9/2015... Done: 11/13/2015
10/23/15 - Walk through with Final Inspection Checklist, left at jobsite. JAD
-Septic System Inspection Reqd
Open
Required: 9/25/2014... ...
Original stamped drawing is required showing all water lines, all water line crossings and all sleeved (under
roadways) transport lines prior to final of BPT

What would you like to do next?

Back to Search
Help Top of Page