Application Date: 5/7/2018 |
Site Address: 970 Carlsborg Rd |
Status: Finaled
System In Use Date: 5/10/2018 |
Sewer Permit: SWR2018-00004
Description: ASBUILT HAS BEEN RECIEVED AND WAITING FOR DECOMISSIONING SIGN |
OFF###5-10-18 Contractor will email the "As-Built" drawing to R. Bradford in the next few days. |
Parcel(s) related to this case: |
(Principle Parcel: Active)
(Click the Parcel Number for more information) |
Documents related to this case: |
Case Process Steps (Review, Decisions, Inspections, etc.) |
Septic Decom Permit Required |
H |
DONE
Required: 5/7/2018... ... Approved: 3/16/2018 |
Side Sewer: Application Rec'd
Done
... ... Received: 5/7/2018 |
Plan Review (H)
DONE
Received: 5/7/2018... ... Completed: 5/8/2018 |
Issue Side Sewer Permit
DONE
OK to Cover / In Use
DONE
... ... Connection In Use: 5/10/2018 |
Side Sewer Inspection
DONE
Required: 5/8/2018... ... Done: 5/10/2018 |
-Septic Decom Final Reqd
AUTO
Requirement Placed: 5/8/2018... ... Requirement Met: 7/10/2019 |
Final Side Sewer Permit
DONE
... ... Finaled: 7/12/2019 |
-Sewer As-Built Required
Open
Requirement Placed: 5/10/2018... ... |