The information below summarizes the case you selected.

Name: P.U.D. #1 OF CLALLAM COUNTY
Application Date: 5/8/2020
Site Address: 110 Idea Pl
Issue Date: 11/5/2020
Status: Finaled
Finaled Date: 4/23/2021
Building Permit: BPT2020-00281
Subtype: Commercial
Description: TENANT IMPROVEMENT; (1) PLUMBING FIXTURE; ENCLOSING ROOM [630 SQFT]
INSIDE WAREHOUSE BUILDING FOR TRANSFORMER REPAIR-LOW ENERGY HEAT
Parcel(s) related to this case:
(Principle Parcel: Active)
(Click the Parcel Number for more information)
Documents related to this case:
Case Process Steps (Review, Decisions, Inspections, etc.)
Case Entered
Done
... ... Date Entered: 5/8/2020
Fee/Value/Area Verification
DONE
Required: 5/8/2020... ... Completed: 5/8/2020
Potable Water Source Reqd (H)
NREQ
Requirement Placed: 5/8/2020... ... Requirement Met: 5/8/2020
Mitigation Cert Review (H)
NREQ
Requirement Placed: 5/8/2020... ... Requirement Met: 5/8/2020
Septic/Sewer Approval Reqd (H)
NREQ
Requirement Placed: 5/8/2020... Referred: 5/8/2020... Requirement Met: 5/8/2020
Drainage Approval Required (H)
NREQ
Requirement Placed: 5/8/2020... ... Requirement Met: 5/8/2020
ALL INTERIOR
Road Approach Required (H)
DONE
Requirement Placed: 5/8/2020... ... Requirement Met: 5/8/2020
Crit Area/Shoreline Rvw (H)
NREQ
Required: 5/8/2020... ... Review Path Decided: 5/8/2020
Planning Review Required (H)
NREQ
Requirement Placed: 5/8/2020... ... Requirement Met: 5/8/2020
Plan Check
DONE
Received: 5/8/2020... Start: 5/22/2020... Completed: 11/5/2020
PLAN REVIEW LETTER 5/22/20 OCCUPANT LOAD=2
Issue permit (F)
DONE
... ... Date Approved: 11/5/2020
Hold Down Inspection
DONE
Required: 11/5/2020... Scheduled: 1/28/2021... Done: 1/28/2021
Shearwall Nailing
DONE
Required: 11/5/2020... Scheduled: 1/28/2021... Done: 1/28/2021
Rough-in Plumbing Inspection
DONE
Required: 11/9/2020... ... Done: 1/28/2021
Framing Inspection
DONE
Required: 11/5/2020... Scheduled: 1/28/2021... Done: 1/28/2021
Interior Shearwall Nailing
DONE
Required: 11/5/2020... ... Done: 1/28/2021
Insulation (Walls) Inspection
DONE
Required: 2/4/2021... ... Done: 2/4/2021
Insulation (Ceiling) Insp
DONE
Required: 11/5/2020... ... Done: 2/4/2021
Final sign-off
DONE
... ... Finaled: 4/23/2021
Fire Protection Inspection
DONE
Required: 11/5/2020... Scheduled: 4/23/2021... Done: 4/23/2021
TYUPE 2A10BC FIRE EXTINGUISHER
Final Inspection
DONE
Required: 11/5/2020... Scheduled: 4/23/2021... Done: 4/23/2021
Insulation (Floors) Inspection
Open
Required: 11/5/2020... Scheduled: 2/4/2021...
Notify Applicant Permit Ready
Open
Requirement Placed: 5/8/2020... ...
-Deferred Submittals (list)
Open
Required: 11/5/2020... ...
LIGHTING PLAN--TYPE AND LOCATION OF NEW LIGHTS AND WATTAGE.
-Deferred Submittals (list)
Open
Required: 11/5/2020... ...
MECHANICAL PLAN ( IF HEAT USED FOR LOW ENERGY)TYPE OF HEATER AND MAXIMUM
WATTAGE-630 WATTS MAXIMUM

What would you like to do next?