Name: WASTE CONNECTIONS INC |
Application Date: 8/30/2018 |
Site Address: 970 Carlsborg Rd |
Status: Finaled
Building Permit: BPT2018-00690
Subtype: Commercial
Description: WASTE FACILITY SUPPORT BUILDING: OFFICES / BREAKROOM / TRUCK |
MAINTENANCE |
Parcel(s) related to this case: |
(Principle Parcel: Active)
(Click the Parcel Number for more information) |
Documents related to this case: |
Case Process Steps (Review, Decisions, Inspections, etc.) |
SEPA Determination Reqd (H)
DONE
Requirement Placed: 9/4/2018... ... Requirement Met: 4/16/2017 |
CUP Required
DONE
Required: 9/4/2018... ... Approved: 5/22/2017 |
Case Entered
Done
... ... Date Entered: 8/30/2018 |
Road Approach Required (H)
DONE
Requirement Placed: 8/30/2018... ... Requirement Met: 8/31/2018 |
existing
Setback Check
DONE
Required: 9/4/2018... ... Approved: 9/4/2018 |
Ownership Verified
DONE
Required: 9/4/2018... ... Approved: 9/4/2018 |
Parking Plan Required
DONE
Required: 9/4/2018... ... Approved: 9/4/2018 |
Crit Area/Shoreline Rvw (H)
NREQ
Required: 8/30/2018... Referred to Planning: 9/4/2018... Review Path Decided: |
9/4/2018 |
none shown
Landscape Plan Required
DONE
Required: 9/4/2018... ... Approved: 10/19/2018 |
Lighting Plan Required
DONE
Required: 9/4/2018... ... Approved: 11/1/2018 |
Planning Coml Review Reqd (H)
DONE
Requirement Placed: 8/30/2018... Rvw activities made: 9/4/2018... Requirement Met: |
11/1/2018 |
CUP Conditions to Issue
DONE
Required: 9/4/2018... ... Conditions Met: 11/1/2018 |
SEPA Conditions to Issue
DONE
Required: 9/4/2018... ... Conditions Met: 11/1/2018 |
Drainage Approval Required (H)
AUTO
Requirement Placed: 8/30/2018... ... Requirement Met: 11/15/2018 |
Engineered drainage revision dra2018-00347
Plan Check
DONE
Received: 8/30/2018... Start: 9/24/2018... Completed: 12/14/2018 |
OCCUPANT LOAD 121
Fee/Value/Area Verification
DONE
Required: 8/30/2018... ... Completed: 12/20/2018 |
see attached notes with re clac info
Potable Water Source Reqd (H)
AUTO
Requirement Placed: 8/30/2018... ... Requirement Met: 12/20/2018 |
Mitigation Cert Review (H)
WSYS
Requirement Placed: 8/30/2018... ... Requirement Met: 12/20/2018 |
AS OF ISSUANCE THEY ARE GOING WITH PUD HOOKUP. |
IF THAT CHANGES TO WELL ; MITIGATION WILL BE REQUIRED PRIOR TO FINAL. INFO PROVIDED |
TO KATHY HARGRAVE CONTACT FOR PROJECT 12/20/2018 |
Septic Approval Required (H)
DONE
Requirement Placed: 8/30/2018... ... Requirement Met: 12/20/2018 |
SWR2018-00009 (sewer permit for new building issued) SWR2018-00015 (sewer permit for new washrack |
issued) |
Notify Applicant Permit Ready
DONE
Requirement Placed: 8/30/2018... ... Applicant Notified: 12/20/2018 |
KATHY HARGROVE PICKED UP PERMIT
Plan Check
DONE
Received: 1/8/2019... ... Completed: 1/9/2019 |
revision
Issue permit (F)
DONE
... ... Date Approved: 12/20/2018 |
Issue permit (F)
DONE
... ... Date Approved: 12/20/2018 |
print front page of BPT
Done
Underslab Plumbing Inspection
FAIL
Required: 12/17/2018... Scheduled: 2/4/2019... Done: 2/4/2019 |
Underslab Plumbing Inspection
DONE
Required: 2/4/2019... Scheduled: 2/7/2019... Done: 2/7/2019 |
Setbacks Inspection
DONE
Required: 12/17/2018... Scheduled: 1/25/2019... Done: 4/9/2019 |
Rough-in Plumbing Inspection
DONE
Required: 12/17/2018... Scheduled: 4/9/2019... Done: 4/9/2019 |
Gas Line (interior) Insp
DONE
Required: 12/17/2018... Scheduled: 5/7/2019... Done: 5/7/2019 |
Erosion Control Measures Insp
DONE
Required: 12/17/2018... Scheduled: 1/25/2019... Done: 6/13/2019 |
Footing Inspection
DONE
Required: 12/17/2018... Scheduled: 5/22/2019... Done: 6/13/2019 |
Gas Line (exterior) Insp
DONE
Required: 12/17/2018... ... Done: 6/13/2019 |
Propane Tank Inspection
DONE
Required: 12/17/2018... ... Done: 6/13/2019 |
Mechanical Systems Inspection
DONE
Required: 12/17/2018... ... Done: 6/13/2019 |
Framing/Airseal/Glazing Insp
DONE
Required: 12/17/2018... Scheduled: 4/12/2019... Done: 6/13/2019 |
Insulation (Floors) Inspection
DONE
Required: 12/17/2018... ... Done: 6/13/2019 |
Insulation (Walls) Inspection
DONE
Required: 12/17/2018... ... Done: 6/13/2019 |
Insulation (Ceiling) Insp
DONE
Required: 12/17/2018... Scheduled: 5/22/2019... Done: 6/13/2019 |
Firewall Inspection
DONE
Required: 4/22/2019... Scheduled: 4/22/2019... Done: 6/13/2019 |
Fire Protection Inspection
DONE
Required: 12/17/2018... ... Done: 6/13/2019 |
FIRE EXTINGUISHERS
Parking Inspection
DONE
Required: 9/4/2018... ... Done: 6/13/2019 |
Exterior Lighting Inspection
DONE
Required: 11/1/2018... ... Done: 6/13/2019 |
Address Posted Inspection
DONE
Required: 12/17/2018... ... Done: 6/13/2019 |
-Deferred Submittals (list)
DONE
Required: 12/17/2018... ... Done: 6/13/2019 |
FIRE SPRINKLER PERMIT, FIRE ALARM PERMIT, VEHICLE EXHAUST SYSTEM FOR GARAGE |
STALLS |
-Special Inspection Reqd
DONE
Required: 12/17/2018... ... Done: 6/13/2019 |
AS LISTED ON PAGES S0.1 AND SO.2
Landscaping Inspection
DONE
Required: 10/19/2018... ... Done: 6/21/2019 |
-SEPA Mitigation Finaled
DONE
Required: 9/4/2018... ... Done: 6/21/2019 |
-CUP Conditions prior to Final
DONE
Required: 9/4/2018... ... Done: 6/21/2019 |
-Drainage Inst as Des Ltr Reqd
DONE
Required: 12/17/2018... ... Done: 6/26/2019 |
IAD RECIEVED AND APPROVED
-Sewer Connection Finaled
DONE
Required: 12/20/2018... ... Done: 7/12/2019 |
FINAL SEWER INSPECTION DOCUMENTATION TO BE SUBMITTED PRIOR TO FINAL OF BPT
-H2O Case Requirements
DONE
Required: 12/20/2018... ... Done: 7/17/2019 |
PROOF OF PUD CONNECTION AS PER ENVIRONMENTAL HEALTH submitted and scanned. OK per |
Adar for final of BPT. |
Final sign-off
Done
... ... Finaled: 7/24/2019 |
Final Inspection
DONE
Required: 12/17/2018... Scheduled: 6/13/2019... Done: 7/24/2019 |