Clallam County, WA

County Home Page Permit Info Start Page Public Comment on Permits Public Online Forms Help

View Case Status

The information below summarizes the case you selected.

Name: PARRISH PARRISH BARTEE
Application Date: 11/22/2017
Site Address: 970 Carlsborg Rd
Issue Date: 11/28/2017
Status: Finaled
Finaled Date: 3/1/2018
Building Permit: BPT2017-00857
Subtype: Commercial
Description: ENCLOSING AREA UNDER EXISTING ROOF OVERHANG ON EXISTING SHOP
BUILDING
Parcel(s) related to this case:
(Principle Parcel: Active)
(Click the Parcel Number for more information)
Documents related to this case:
Case Process Steps (Review, Decisions, Inspections, etc.)
Mitigation Cert Review (H)
WSYS
Requirement Placed: 10/27/2017... ... Requirement Met: 10/27/2017
Crit Area/Shoreline Rvw (H)
NREQ
Required: 10/27/2017... ... Review Path Decided: 10/27/2017
none shown
Planning Review Required (H)
DONE
Requirement Placed: 10/27/2017... ... Requirement Met: 10/27/2017
no req for this bpt per dkc
Planning Coml Review Reqd (H)
Done
Requirement Placed: 10/27/2017... ... Requirement Met: 10/27/2017
no req for this bpt per dkc
Case Entered
Done
... ... Date Entered: 11/22/2017
Plan Check
DONE
Received: 10/27/2017... Start: 11/22/2017... Completed: 11/22/2017
1/10/18 Revisions submitted
1/16/18 Revisions completed JAD
Fee/Value/Area Verification
DONE
Required: 10/27/2017... ... Completed: 11/27/2017
Potable Water Source Reqd (H)
DONE
Requirement Placed: 10/27/2017... ... Requirement Met: 11/27/2017
Septic Approval Required (H)
DONE
Requirement Placed: 10/27/2017... ... Requirement Met: 11/27/2017
current report showing reserve area prior to request for final of bpt
Drainage Approval Required (H)
DONE
Requirement Placed: 10/27/2017... ... Requirement Met: 11/27/2017
staying within the existing footprint; no requirement for this permit
Road Approach Required (H)
DONE
Requirement Placed: 10/27/2017... ... Requirement Met: 11/27/2017
existing
Notify Applicant Permit Ready
DONE
Requirement Placed: 10/27/2017... ... Applicant Notified: 11/27/2017
called main contact
Issue permit (F)
DONE
... ... Date Approved: 11/28/2017
Setbacks Inspection
DONE
Required: 11/22/2017... Scheduled: 12/7/2017... Done: 12/7/2017
Footing Inspection
DONE
Required: 11/22/2017... Scheduled: 12/7/2017... Done: 12/7/2017
Hold Down Inspection
DONE
Required: 11/22/2017... Scheduled: 1/12/2018... Done: 1/12/2018
Shearwall Nailing
DONE
Required: 11/22/2017... Scheduled: 1/12/2018... Done: 1/12/2018
Final sign-off
Done
... ... Finaled: 3/1/2018
Framing Inspection
DONE
Required: 11/22/2017... Scheduled: 3/1/2018... Done: 3/1/2018
Fire Protection Inspection
DONE
Required: 11/22/2017... Scheduled: 3/1/2018... Done: 3/1/2018
Fire Extinguishers
Address Posted Inspection
DONE
Required: 11/22/2017... ... Done: 3/1/2018
Final Inspection
DONE
Required: 11/22/2017... Scheduled: 3/1/2018... Done: 3/1/2018
Erosion Control Measures Insp
Open
Required: 11/22/2017... ...
-Septic System Inspection Reqd
Open
Required: 11/27/2017... ...
current report showing reserve area prior to request for final of bpt

What would you like to do next?

Back to Search