Name: PUBLIC UTILITY DIST NO 1
Application Date: 5/15/2014
Site Address: 110 B Idea Pl
Issue Date: 7/25/2014
Status: Finaled
Finaled Date: 11/2/2015
Building Permit: BPT2014-00234
Subtype: Commercial
Description: CHANGE OF USE & NEW ENGINEERING/DISPATCH ADDITION
Parcel(s) related to this case:
(Principle Parcel: Active)
(Click the Parcel Number for more information)
Documents related to this case:
Case Process Steps (Review, Decisions, Inspections, etc.)
Case Entered
Done
... ... Date Entered: 5/15/2014
Mitigation Cert Review (H)
WSYS
Requirement Placed: 5/15/2014... ... Requirement Met: 5/15/2014
PUD
Road Approach Required (H)
DONE
Requirement Placed: 5/15/2014... ... Requirement Met: 5/15/2014
EXISTING
Crit Area/Shoreline Rvw (H)
OUT
Required: 5/15/2014... ... Review Path Decided: 5/15/2014
SEPA Determination Reqd (H)
DONE
Requirement Placed: 5/15/2014... Review begun: 7/11/2013... Requirement Met:
5/15/2014
SEPA Conditions to Issue
DONE
Required: 5/15/2014... ... Conditions Met: 5/15/2014
Was a DNS, no requirements
Drainage Approval Required (H)
DONE
Requirement Placed: 5/15/2014... ... Requirement Met: 6/2/2014
PER RAY, NO REQUIREMENTS FOR THIS PERMIT BECAUSE IT IS GOING ONTO EXSITING
ASPHALT
Plan Check
DONE
Received: 5/15/2014... Start: 6/4/2014... Completed: 7/23/2014
Occupant load = 62 (addition only) Total O.L. for existing and new = 138
Setback Check
DONE
Required: 5/15/2014... ... Approved: 7/24/2014
OKAY VERIFIED WITH DONELLA
Ownership Verified
DONE
Required: 5/15/2014... ... Approved: 7/24/2014
Lighting Plan Required
DONE
Required: 5/15/2014... ... Approved: 7/24/2014
Landscape Plan Required
DONE
Required: 5/15/2014... ... Approved: 7/24/2014
existing per previous permits
Parking Plan Required
DONE
Required: 5/15/2014... Submitted: 7/24/2014... Approved: 7/24/2014
Potable Water Source Reqd (H)
DONE
Requirement Placed: 5/15/2014... ... Requirement Met: 7/24/2014
NO REQ FOR THIS PERMIT PER EH
Septic Approval Required (H)
DONE
Requirement Placed: 5/15/2014... ... Requirement Met: 7/24/2014
OKAY FOR ISSUANCE PER J REED; CURRENT REPORT FROM LICENSED DESIGNER TO BE
SUBMITTED TO EH PRIOR TO FINAL OF BPT
Planning Review Required (H)
DONE
Requirement Placed: 5/15/2014... ... Requirement Met: 7/24/2014
5/15/14 ROUTED TO DONELLA FOR REVIEW
Planning Coml Review Reqd (H)
DONE
Requirement Placed: 5/15/2014... Rvw activities made: 5/15/2014... Requirement Met:
7/24/2014
5/15/14 ROUTED TO DONELLA FOR REVIEW
-SEPA Mitigation Finaled
DONE
Required: 5/15/2014... ... Done: 5/15/2014
No requirements
Underslab Plumbing Inspection
DONE
Required: 12/15/2014... Scheduled: 12/15/2014... Done: 12/15/2014
Shearwall Nailing
DONE
Required: 7/22/2014... ... Done: 1/26/2015
Conference room/ ADDITION..3/18
Hold Down Inspection
DONE
Required: 7/22/2014... ... Done: 3/18/2015
Rough-in Plumbing Inspection
DONE
Required: 7/22/2014... ... Done: 3/23/2015
Framing/Airseal/Glazing Insp
DONE
Required: 7/22/2014... Scheduled: 5/6/2015... Done: 5/7/2015
Insulation (Walls) Inspection
DONE
Required: 7/22/2014... Scheduled: 5/12/2015... Done: 5/13/2015
Miscellaneous Insp. (Notes)
DONE
Required: 7/22/2014... Scheduled: 9/28/2015... Done: 10/27/2015
SUSPENDED CEILING GRID
Miscellaneous Insp. (Notes)
DONE
Required: 7/22/2014... ... Done: 10/27/2015
SPECIAL INSPECTION: Fabrication of structural load bearing members and assemblies ( page S1-3)
Miscellaneous Insp. (Notes)
DONE
Required: 7/22/2014... ... Done: 10/27/2015
SPECIAL INSPECTION: Concrete - reinforceing steel, anchor placement, concrete mix, concrete
placement, form work (page S1-3)
Miscellaneous Insp. (Notes)
DONE
Required: 7/22/2014... ... Done: 10/27/2015
SPECIAL INSPECTION - STEEL: Task welding, after task welding (S1-3)
Miscellaneous Insp. (Notes)
DONE
Required: 7/22/2014... ... Done: 10/27/2015
SPECIAL INSPECTION: Bolting (prior to, during, after), steel elements (page S1-3)
Miscellaneous Insp. (Notes)
DONE
Required: 7/22/2014... ... Done: 10/27/2015
SPECIAL INSPECTION: Seismic resistance (S1-4)
Miscellaneous Insp. (Notes)
DONE
Required: 7/22/2014... ... Done: 10/27/2015
SPECIAL INSPECTION: Wind resistance (S1-4)
Miscellaneous Insp. (Notes)
DONE
Required: 7/22/2014... ... Done: 10/27/2015
SPECIAL INSPECTION - Pre-engineered structures (S1-4)
Miscellaneous Insp. (Notes)
DONE
Required: 7/22/2014... ... Done: 10/27/2015
SPECIAL INSPECTION - TESTING (see list page S1-4)
Miscellaneous Insp. (Notes)
DONE
Required: 7/22/2014... ... Done: 10/27/2015
SPECIAL INSPECTION : Geotechnical (fill, compaction, verify soil bearing capacity) (page S1-3)
Setbacks Inspection
DONE
Required: 7/22/2014... ... Done: 10/27/2015
Erosion Control Measures Insp
DONE
Required: 7/22/2014... ... Done: 10/27/2015
Footing Inspection
DONE
Required: 7/22/2014... Scheduled: 1/26/2015... Done: 10/27/2015
Foundation Stem Wall Insp
DONE
Required: 7/22/2014... ... Done: 10/27/2015
Rough-in Plumbing Inspection
DONE
Required: 4/6/2015... Scheduled: 4/6/2015... Done: 10/27/2015
Mechanical Systems Inspection
DONE
Required: 7/22/2014... Scheduled: 9/17/2015... Done: 10/27/2015
Insulation (Floors) Inspection
DONE
Required: 7/22/2014... ... Done: 10/27/2015
Insulation (Ceiling) Insp
DONE
Required: 7/22/2014... Scheduled: 6/16/2015... Done: 10/27/2015
Fire Protection Inspection
DONE
Required: 7/22/2014... ... Done: 10/27/2015
Exterior Lighting Inspection
DONE
Required: 7/24/2014... ... Done: 10/27/2015
Address Posted Inspection
DONE
Required: 7/22/2014... ... Done: 10/27/2015
-Fire Sprinkler Permit Reqd
DONE
Required: 7/22/2014... ... Done: 10/27/2015
-Fire Alarm Permit Required
DONE
Required: 7/22/2014... ... Done: 10/27/2015
-Deferred Submittals (list)
DONE
Required: 7/22/2014... ... Done: 10/27/2015
Premanufactured truss and floor joists, pre-engineered steel stairs, equipment anchorage, including curbs,
seismic design of non-structural components, fall arrest system (S1-1)
-Special Inspection Reqd
DONE
Required: 7/22/2014... ... Done: 10/27/2015
-Energy Compliance Certificate
DONE
Required: 7/22/2014... ... Done: 10/27/2015
Final sign-off
Done
... ... Finaled: 11/2/2015
Final Inspection
DONE
Required: 7/22/2014... Scheduled: 11/2/2015... Done: 11/2/2015
-Drainage Inst as Des Ltr Reqd
DONE
Required: 7/22/2014... ... Done: 11/2/2015
-Septic System Inspection Reqd
Open
Required: 7/24/2014... ...
prior to final of bpt submit a current system status report from a licensed designer.
-Truss Calcs Approved
Open
Required: 7/22/2014... ...