Name: PUD #1 OF CLALLAM COUNTY
Application Date: 6/19/2013
Site Address: 110 Idea Pl
Issue Date: 9/4/2013
Status: Finaled
Finaled Date: 11/23/2015
Building Permit: BPT2013-00293
Subtype: Commercial
Description: SHOP/OFFICE/SUPPORT SPACES (Substation Department Shop Building) ##
SEPARATE PERMITS REQUIRED FOR SPRINKLER AND FIRE ALARM SYSTEMS ##
ENGINEER'S "INSTALLED AS DESIGNED" LETTER TO BE SUBMITTED AND APPROVED PRIOR TO
FINAL INSPECTION
Parcel(s) related to this case:
(Principle Parcel: Active)
(Click the Parcel Number for more information)
Documents related to this case:
Case Process Steps (Review, Decisions, Inspections, etc.)
Mitigation Cert Review (H)
WSYS
... ... Requirement Met: 6/19/2013
PUD
Road Approach Required (H)
DONE
... ... Requirement Met: 6/19/2013
EXISTING
Critical Areas Appr Req'd (H)
DONE
... ... Requirement Met: 6/19/2013
NO REQ
Case Entered
Done
... ... Date Entered: 6/20/2013
Ownership Verified
DONE
Required: 6/20/2013... ... Approved: 6/20/2013
Potable Water Source Required
AUTO
... ... Requirement Met: 6/27/2013
PENDING PUD
Drainage Approval Required (H)
AUTO
... ... Requirement Met: 6/27/2013
PENDING ENGINEER PLAN
SEPA Determination Reqd (H)
AUTO
Requirement Placed: 6/20/2013... ... Requirement Met: 7/12/2013
Due to size of building, not SEPA exempt.
Plan Check
DONE
Received: 6/19/2013... Start: 7/23/2013... Completed: 8/30/2013
Total Occupant load = 36 (11 shop/23 office/ 2 mezzanine)
7-29-2013 - Plan review letter sent.
Miscellaneous action
DONE
... ... Date: 9/4/2013
Septic Approval Required (H)
DONE
... Referred: 6/19/2013... Requirement Met: 9/4/2013
SAN2013-0051
Planning Coml Review Reqd (H)
DONE
Requirement Placed: 6/19/2013... ... Requirement Met: 9/4/2013
ROUTED TO DONELLA
Issue permit (F)
Done
... ... Date Approved: 9/4/2013
(B) Renewal Notice sent (F)
Done
... ... Date: 7/8/2015
Renew Building Permit
Done
... ... Renewed: 8/21/2015
Setbacks Inspection
DONE
Required: 7/25/2013... ... Done: 3/4/2015
Underslab Plumbing Inspection
DONE
Required: 8/30/2013... ... Done: 3/24/2015
Underslab Plumbing Inspection
DONE
Required: 3/23/2015... Scheduled: 3/24/2015... Done: 3/24/2015
Insulation (Floors) Inspection
DONE
Required: 7/25/2013... ... Done: 3/27/2015
Hydronic Piping Inspection
DONE
Required: 8/30/2013... ... Done: 4/6/2015
Footing Inspection
DONE
Required: 4/8/2015... Scheduled: 4/8/2015... Done: 4/8/2015
Slab
Insulation (Walls) Inspection
DONE
Required: 7/25/2013... ... Done: 6/16/2015
Insulation (Ceiling) Insp
DONE
Required: 7/25/2013... ... Done: 6/16/2015
Hold Down Inspection
DONE
Required: 7/25/2013... Scheduled: 3/18/2015... Done: 7/30/2015
Shearwall Nailing
DONE
Required: 7/25/2013... Scheduled: 3/18/2015... Done: 7/30/2015
Framing/Airseal Inspection
DONE
Required: 7/25/2013... Scheduled: 7/30/2015... Done: 7/30/2015
Rough-in Plumbing Inspection
DONE
Required: 7/25/2013... Scheduled: 8/11/2015... Done: 8/12/2015
Mechanical Systems Inspection
DONE
Required: 7/25/2013... Scheduled: 9/16/2015... Done: 9/16/2015
Drainage Inst as Des Ltr Reqd
DONE
Required: 7/25/2013... ... Done: 10/13/2015
ENGINEER'S INSTALLED AS DESIGNED LETTER APPROVED AND FINAL
Miscellaneous inspection
DONE
Required: 7/29/2013... Scheduled: 9/28/2015... Done: 10/27/2015
Fire District #3 fire inspection prior to County final inspection.
Miscellaneous inspection
DONE
Required: 8/30/2013... ... Done: 10/27/2015
Special Inspection - excavating, grading, fill
Miscellaneous inspection
DONE
Required: 8/30/2013... ... Done: 10/27/2015
Special Inspection - rebar, concrete,
Miscellaneous inspection
DONE
Required: 8/30/2013... ... Done: 10/27/2015
Special Inspection - structural steel, high strength bolting, fabrication & erection, welding
Miscellaneous inspection
DONE
Required: 8/30/2013... ... Done: 10/27/2015
Special Inspection - shear walls, floor sheathing
Footing Inspection
DONE
Required: 7/25/2013... ... Done: 10/27/2015
OK WITH ENGINEERS REPORT
Foundation Stem Wall Insp
DONE
Required: 7/25/2013... Scheduled: 3/10/2015... Done: 10/27/2015
OK W/ SPECIAL INSPECTION
Structural Observation Insp
DONE
Required: 8/30/2013... ... Done: 10/27/2015
Pre-fab metal building framing
Firewall Inspection
DONE
Required: 8/30/2013... ... Done: 10/27/2015
2nd layer GWB @ battery room
Firewall Inspection
DONE
Required: 8/30/2013... ... Done: 10/27/2015
1st layer GWB @ battery room
Fire Protection Inspection
DONE
Required: 7/25/2013... ... Done: 10/27/2015
Landscaping Inspection
DONE
Required: 6/21/2013... ... Done: 10/27/2015
Want to make sure existing plants that may have been previously required are alive.
Address Posted Inspection
DONE
Required: 7/25/2013... ... Done: 10/27/2015
Final sign-off
Done
... ... Finaled: 11/23/2015
Erosion Control Measures Insp
DONE
Required: 7/25/2013... ... Done: 11/23/2015
Final Inspection
DONE
Required: 7/25/2013... Scheduled: 11/20/2015... Done: 11/23/2015
Septic System Final Reqd
Open
Required: 7/25/2013... ...