Name: P.U.D. #1 OF CLALLAM COUNTY |
Application Date: 8/30/2007 |
Site Address: 110 Idea Pl |
Status: Finaled
Building Permit: BPT2007-00669
Subtype: Commercial
Description: CHANGE OF USE - INTERIOR SPACE OF OPERATIONS CENTER'S WAREHOUSE |
INTO AN OFFICE (S-1 TO B OCCUPANCY)# (ORIGINAL PERMIT BPT97-00965) |
Parcel(s) related to this case: |
(Principle Parcel: Active)
(Click the Parcel Number for more information) |
Documents related to this case: |
Case Process Steps (Review, Decisions, Inspections, etc.) |
Potable Water Source Required
DONE
... ... Requirement Met: 8/30/2007 |
EXISTING OKAY FOR THIS PROJECT
Septic Approval Required (H)
DONE
... Referred: 8/30/2007... Requirement Met: 8/30/2007 |
EXISTING OKAY FOR THIS PROJECT
Drainage Approval Required (H)
DONE
... ... Requirement Met: 8/30/2007 |
IN FOOTPRINT
Road Approach Required (H)
DONE
... ... Requirement Met: 8/30/2007 |
EXISTING
Critical Areas Appr Req'd (H)
DONE
... ... Requirement Met: 8/30/2007 |
NO REQ.
Case Entered
Done
... ... Date Entered: 9/5/2007 |
Plan Check
DONE
Received: 9/10/2007... Start: 9/10/2007... Completed: 10/4/2007 |
ltr sent to CON 10/4/07 New office is warehouse's office. Construction out of metal ceiling joists and |
metal studs. OK for Knight Fire to drop 1-head from main directly above into 126 sq ft office below. Riser |
valve controls are directly to South of this office space being created (no loss of hydraulics). Warehouse |
is conditioned space via previous records. SM |
Issue permit (F)
Done
... ... Date Approved: 10/4/2007 |
Framing/Airseal Inspection
DONE
Required: 9/10/2007... Scheduled: 11/1/2007... Done: 11/1/2007 |
Final sign-off
DONE
... ... Finaled: 12/13/2007 |
Mechanical Systems Inspection
DONE
Required: 9/10/2007... Scheduled: 12/13/2007... Done: 12/13/2007 |
Insulation (Walls) Inspection
DONE
Required: 9/10/2007... Scheduled: 12/13/2007... Done: 12/13/2007 |
Insulation (Ceiling) Insp
DONE
Required: 9/10/2007... Scheduled: 12/13/2007... Done: 12/13/2007 |
Firewall Inspection
DONE
Required: 9/10/2007... Scheduled: 12/13/2007... Done: 12/13/2007 |
Final Inspection
DONE
Required: 9/10/2007... Scheduled: 12/13/2007... Done: 12/13/2007 |