Clallam County, WA

County Home Page Permit Info Start Page Public Comment on Permits Public Online Forms Help

View Case Status

The information below summarizes the case you selected.

Name: P.U.D. #1 OF CLALLAM COUNTY
Application Date: 8/30/2007
Site Address: 110 Idea Pl
Issue Date: 10/4/2007
Status: Finaled
Finaled Date: 12/13/2007
Building Permit: BPT2007-00669
Subtype: Commercial
Description: CHANGE OF USE - INTERIOR SPACE OF OPERATIONS CENTER'S WAREHOUSE
INTO AN OFFICE (S-1 TO B OCCUPANCY)# (ORIGINAL PERMIT BPT97-00965)
Parcel(s) related to this case:
(Principle Parcel: Active)
(Click the Parcel Number for more information)
Documents related to this case:
Case Process Steps (Review, Decisions, Inspections, etc.)
Potable Water Source Required
DONE
... ... Requirement Met: 8/30/2007
EXISTING OKAY FOR THIS PROJECT
Septic Approval Required (H)
DONE
... Referred: 8/30/2007... Requirement Met: 8/30/2007
EXISTING OKAY FOR THIS PROJECT
Drainage Approval Required (H)
DONE
... ... Requirement Met: 8/30/2007
IN FOOTPRINT
Road Approach Required (H)
DONE
... ... Requirement Met: 8/30/2007
EXISTING
Critical Areas Appr Req'd (H)
DONE
... ... Requirement Met: 8/30/2007
NO REQ.
Case Entered
Done
... ... Date Entered: 9/5/2007
Plan Check
DONE
Received: 9/10/2007... Start: 9/10/2007... Completed: 10/4/2007
ltr sent to CON 10/4/07 New office is warehouse's office. Construction out of metal ceiling joists and
metal studs. OK for Knight Fire to drop 1-head from main directly above into 126 sq ft office below. Riser
valve controls are directly to South of this office space being created (no loss of hydraulics). Warehouse
is conditioned space via previous records. SM
Issue permit (F)
Done
... ... Date Approved: 10/4/2007
Framing/Airseal Inspection
DONE
Required: 9/10/2007... Scheduled: 11/1/2007... Done: 11/1/2007
Final sign-off
DONE
... ... Finaled: 12/13/2007
Mechanical Systems Inspection
DONE
Required: 9/10/2007... Scheduled: 12/13/2007... Done: 12/13/2007
Insulation (Walls) Inspection
DONE
Required: 9/10/2007... Scheduled: 12/13/2007... Done: 12/13/2007
Insulation (Ceiling) Insp
DONE
Required: 9/10/2007... Scheduled: 12/13/2007... Done: 12/13/2007
Firewall Inspection
DONE
Required: 9/10/2007... Scheduled: 12/13/2007... Done: 12/13/2007
Final Inspection
DONE
Required: 9/10/2007... Scheduled: 12/13/2007... Done: 12/13/2007

What would you like to do next?

Back to Search
Help Top of Page